Login | Register
 
Welcome
Home
About Us
Community Amenities
Public Documents
Emergency Information
Contractors Q & A
Contact Us
 
Members
Board of Directors
BoD Meeting Information & Zoom Link
Committees
Member Documents
Upcoming Events
Resources
Reservations
Neighborhood Security
Wildfire Management
Member Directory
Message Board
Photo Gallery
Site Search
Board of Directors Only
 
Contractors Q & A  
   
Welcome to Queen's Gate Contractors Q & A Page.
 
Queen’s Gate – ACC Quick Reference Guide
 
General Architectural Requirements
  • ACC Approval Required
  • All exterior modifications, construction, or landscaping (except minor replanting) require prior written approval from the Architectural Control Committee (ACC).
  • Do not sign contracts, schedule work, or begin construction until written ACC approval is received.
  • Submission Process
  • Submit ACC request form that will include detailed plans/specifications: type, shape, height, materials, and exact location.
  • Submit at least 30 days before intended start date.
  • Forms available on the Queen’s Gate website or from the Site Manager.
  • Completed applications may be submitted by email, mail, or hand-delivery to the Site Manager.

 
Exterior Guidelines (Highlights for Contractors)
  • Roofing
  • Only approved materials: tile, wood shake, aluminum/polymer shake, or standing seam metal.
  • ACC approval required for both material and color.
  • Walls & Fences
  • Maximum height: 6 ft.
  • Materials: stucco, stone, lava rock.
  • Must not block drainage or neighbor’s view.
  • Walls higher than 30 in. require a City & County of Honolulu building permit.
  • Driveways
  • Materials: concrete, stone, Futura stone, decorative brick/block.
  • Repairs must match the existing surface.
  • Gates
  • Acceptable: metal, wood, or vinyl.
  • Must coordinate with house colors.
  • Other Exterior Items (all require ACC approval)
  • Mailboxes
  • Garage doors
  • Gutters/piping
  • Solar panels
  • A/C units
  • Landscaping
  • Automatic irrigation required for all planted areas.
  • No sharp-edged rocks in the parkway strip.
  • Must be neat, trimmed, and not obstruct sidewalks or damage property.
  • Yard debris may not be blown into streets, storm drains, or neighboring lots.
  • Street-facing walls must have plantings in front (bare walls not approved).

 
Construction & Maintenance Rules
  • Permits & Approvals
  • City/County permits, and ACC approval must be obtained before work begins.
  • Lot Boundaries
  • All work must remain within the owner’s lot boundaries.
  • Owner is responsible for correcting any violations.
  • Contractor Conduct
  • All workers must comply with Queen’s Gate House Rules.
  • Work hours: 8:00 AM – 5:00 PM, Monday–Saturday.
  • No work on Sundays (except emergencies).
  • Parking
  • Contractor vehicles may not park in cul-de-sac necks.
  • Short-term delivery parking permitted.
  • Debris & Clean-Up
  • Streets must be kept free of dirt, concrete, grass, and leaves.
  • No hosing, sweeping, or blowing debris into streets or drains.
  • On-site debris must be stacked, placed in dumpsters, or covered daily.
  • All debris and dumpsters must be removed at project completion.
  • Dumpsters
  • Must be placed in driveways.
  • Street placement requires Site Manager approval.
  • Portable Toilets
  • Location must be approved by ACC/Site Manager.
  • Must be serviced weekly (or more often if needed).
  • Must be removed at project completion.
  • Damage & Drainage
  • Contractor/owner must prevent disruption of existing drainage systems.
  • Any damage to common areas must be repaired at owner’s expense.
  • Paint & Surface Preparation
  • ACC approval required for all new paint colors and repainting.
  • Overspray, dust, and runoff must be contained on owner’s property.
  • Owner/contractor responsible for any damage to neighboring homes, cars, or common areas.
  • Project Schedule
  • Work must begin within 60 days of ACC approval.
  • Work must be completed within 180 days.
  • Extensions may be requested from the ACC.
  • Enforcement
  • Violations are subject to penalties under Queen’s Gate House Rules.
 
If you have questions or need assistance, contact Queen's Gate Site Manager
Mobile: (808) 554-2837 Email: queensgatemgr@gmail.com
 
 
 
© Copyright 2025 Queen's Gate Community Association | Condo Website by HOA Sites | Terms of Use | Admin